Home > News > Content
Led Point Light Source Application
Nov 30, 2018
  1. The first step is to install the point light source on the wall. First, we need to make a hole in the wall, install the expansion screw, then install the point light source and lock it with some self-tapping screws. Note that each The distance between a point light source needs to be arranged according to the customer's requirements; in general, the distance is between 10 cm and 20 cm.

  2.  In the second step, the power line and the signal line of the guardrail light of the point light source are connected to each other. Generally speaking, the power line is a two-core plug, and the signal line is a four-core or five-core plug;

  3. . The third step We need to install a power supply, that is, a transformer or a switching power supply.

  4. The fourth step is to officially install the controller of the point light barrier light. First of all, we need to install the sub-controller, just connect the sub-controller directly to the point-light source, and then use the signal of the sub-controller and the main controller to connect. If the distance between the sub-control and the main control is relatively far At the time, we can connect them with a few super five network cables, so the signal will be better.

    O20 pixel led ball

Related News

Copyright © Shenzhen SH LED Technology Co.,Ltd All Rights Reserved.