The lighting layout of the bridge lighting project directly affects the actual effect of the lighting and the difficulty of after-sales maintenance and management. The lighting fixtures on both sides of the bridge are arranged too high, so that the effect of light radiation and reflection is not obvious. If the position of the lamp is too high, the lamp is easily damaged by external force, which increases safety hazards and operation and maintenance costs. If the luminaire is installed in a lower position, construction operations and future maintenance will be more difficult, and the brightness enhancement effect of the bridge will be worse due to the increased influence of the light.

When laying bridges and pipelines on the bridge, attention should be paid to the damage and impact to the existing bridge structure during the installation of the bridge and pipeline supports. Therefore, during the construction of the bridge lighting project, the waste holes generated during the bracket installation process should be sealed with epoxy mortar in time to reduce the damage to the bridge structure.
The bridge lighting project is the construction work of a new lighting installation project outside the existing structure. The new lamps are all exposed, and some of the lamps are small in number, and it is inevitable that they will be damaged and affected by the outside world and man-made. In order to ensure the safe use of lamps and reduce damage, safety fences and protective covers have been added to some lighting lamps to reduce man-made damage.

During the construction of the bridge lighting project, safety management is difficult. On the one hand, the bridge is the main channel of urban roads, and the traffic flow is large, and the construction is seriously affected by external interference; on the other hand, there is water passing under the bridge, and the bridge deck landscape lighting is to install lamps on both sides of the bridge, which requires temporary high-altitude operations. Danger. Therefore, during the construction process, safety management is more difficult and safety requirements are higher.