To do the design and lighting project plan, we must first understand the project overview. The amount of Party A’s investment budget, whether the nature of the project is a scenic spot, a park, a square or a green space? Only in this way can we know the accurate positioning of the project. Before going to the site to inspect, you should ask for some information from Party A, mainly the exterior renderings, plan and elevation of the project. The CAD drawings of the plan and elevation can more accurately grasp the various dimensions needed to calculate the project. Volume and investment estimates. With these basic information and a preliminary understanding of the project, it is necessary to inspect the site, inspect the progress of the project, inspect the surrounding ambient light, and also inspect the specific conditions of the building material, installation method, and location of the distribution box. With these Capital information, proceed to the design stage.

The design and lighting project generally goes through three stages: the first is the conceptual design and intention display stage, the second is the deepening design stage, and the third is the construction drawing design stage. At this stage, the main test is the design level of the chief designer and the overall ability of the team, including the presentation ability of renderings, and the ability to report and communicate with Party A. The former requires neither to be too perfect from reality and impossible to achieve later. In order to prevent the lack of creative design, the latter mainly needs eloquence reporting ability, practical experience and artistic appeal. If this ability is poor, even a good plan will not be able to move Party A. If the experience is poor, Party A The disagreement cannot be explained well, and it will also affect Party A’s evaluation of the lighting plan. Only after communication with Party A and repeated discussions and modifications can we come up with a set of good and landing lighting solutions.