To do the design and lighting project plan, we must first understand the project overview. Party A’s investment budget, whether the nature of the project is a scenic spot, a park, a square or a green space? If the project is a building, is it a hotel, a shopping mall, a supermarket, an office building, a residence, or an industrial zone factory building, development zone office, etc. In order to know the accurate positioning of the project. Before going to the site, you must ask for some information from Party A, mainly the exterior renderings, floor plans and elevations of the project. If there are no renderings or large changes, the actual photos of the site are required to make the design effect. picture. The CAD drawings of the plane and elevation can more accurately grasp the various required dimensions in order to calculate the engineering quantity and investment estimation. With these basic information and a preliminary understanding of the project, it is necessary to go to site inspection, because no matter how accurate and rich the drawings are, they cannot represent the actual situation of the site. Therefore, we must inspect the site, inspect the progress of the project, and inspect the surrounding environment. Light, it is necessary to investigate the specific conditions of the building material, installation method, distribution box location, etc. If it is a garden landscape lighting project, the method is basically similar. With these capital information, proceed to the design stage.

The design and lighting project generally goes through three stages: the first is the conceptual design and intention display stage, the second is the deepening design stage, and the third is the construction drawing design stage. At this stage, the main test is the design level of the chief designer and the overall ability of the team, including the presentation ability of renderings, and the ability to report and communicate with Party A. The former requires neither to be too perfect from reality and impossible to achieve later. In order to prevent the lack of creative design, the latter mainly needs eloquence reporting ability, practical experience and artistic appeal. If this ability is poor, even a good plan will not be able to move Party A. If the experience is poor, Party A The disagreement cannot be explained well, and it will also affect Party A’s evaluation of the lighting plan. Only after communication with Party A and repeated discussions and modifications can we come up with a set of good and landing lighting solutions.